Solar plant: site data

Solar power plant in Dubovyi Hai, Shepetivskyi Raion, Khmelnytskyi Oblast

Dubovyi Hai: 1,103 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). Exactly the oblast median (1,100). #71 of 307 in the rayon, #481 of 1109 in the oblast.

Shepetivka, the rayon centre, is 39 km away. 274 m above sea level. 11 km away: Polonne, the nearest bigger centre, the same 1,103. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 78 km. 12.11 m between rows, pitch 15.93 m (latitude 50.0°).

Yield of 1 kWp
1,103kWh/year
Tilt
37°1° east of south
10 kW
11,034kWh/year
Row pitch
15.93m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Dubovyi Hai

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 78 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan50Feb89Mar119Apr136May140Jun142Jul138Aug111Sep84Oct36Nov29Dec

July: 142 kWh/kWp, December: 29 — 4.9 times less.

January: 30 against 32 in the oblast, 6.3% less.

Dubovyi Hai: plants, kWh
kWpA yearJulyDecember
55,517710145
1011,0341,420290
1516,5512,130435

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shepetivskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.