Solar plant: site data

Solar power plant in Chankiv, Kamianets-Podilskyi Raion, Khmelnytskyi Oblast

Chankiv: 1,132 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 2.9% above the oblast median (1,100). #97 of 226 in the rayon, #99 of 1109 in the oblast.

Kamyanets-Podilskyi, the rayon centre, is 27 km away. 334 m above sea level. 27 km away: Kamyanets-Podilskyi, the nearest bigger centre, the same 1,129. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 61 km. 10.86 m between rows, pitch 14.73 m (latitude 48.9°).

Yield of 1 kWp
1,132kWh/year
Tilt
36°1° east of south
10 kW
11,323kWh/year
Row pitch
14.73m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Chankiv

The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 61 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb94Mar119Apr136May137Jun141Jul140Aug116Sep86Oct40Nov34Dec

July: 141 kWh/kWp, December: 34 — 4.1 times less.

December: 34 against 29 in the oblast, 17.2% more.

Chankiv: plants, kWh
kWpA yearJulyDecember
55,662705170
1011,3231,410340
1516,9852,115510

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kamianets-Podilskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.