Solar plant: site data

Solar power plant in Borshchivka, Khmelnytskyi Raion, Khmelnytskyi Oblast

Borshchivka: 1,082 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.6% below the oblast median (1,100). #506 of 576 in the rayon, #989 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 49 km away. 304 m above sea level. 13 km away: Teofipol, the nearest bigger centre, the same 1,080. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 49 km. 11.58 m between rows, pitch 15.45 m (latitude 49.7°).

Yield of 1 kWp
1,082kWh/year
Tilt
36°1° east of south
10 kW
10,824kWh/year
Row pitch
15.45m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Borshchivka

The designer opens with this place’s coordinates, latitude 49.7° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 49 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

28Jan47Feb83Mar117Apr134May136Jun140Jul138Aug112Sep84Oct37Nov28Dec

July: 140 kWh/kWp, January: 28 — 5.0 times less.

January: 28 against 32 in the oblast, 12.5% less.

Borshchivka: plants, kWh
kWpA yearJulyJanuary
55,412700140
1010,8241,400280
1516,2362,100420

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.