Solar plant: site data

Solar power plant in Avratyn, Khmelnytskyi Raion, Khmelnytskyi Oblast

Avratyn: 1,080 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.8% below the oblast median (1,100). #534 of 576 in the rayon, #1030 of 1109 in the oblast.

Khmelnytskyi, the rayon centre, is 56 km away. 309 m above sea level. 17 km away: Volochysk, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 53 km. 11.51 m between rows, pitch 15.38 m (latitude 49.7°).

Yield of 1 kWp
1,080kWh/year
Tilt
36°2° east of south
10 kW
10,800kWh/year
Row pitch
15.38m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Avratyn

The designer opens with this place’s coordinates, latitude 49.7° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 53 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

28Jan46Feb84Mar116Apr133May135Jun140Jul137Aug112Sep83Oct36Nov29Dec

July: 140 kWh/kWp, January: 28 — 5.0 times less.

January: 28 against 32 in the oblast, 12.5% less.

Avratyn: plants, kWh
kWpA yearJulyJanuary
55,400700140
1010,8001,400280
1516,2002,100420

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khmelnytskyi RaionKhmelnytskyi Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.