Solar plant: site data

Solar power plant in Virivka, Beryslavskyi Raion, Kherson Oblast

Virivka: 1,251 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,253). #4 of 151 in the rayon, #384 of 711 in the oblast.

Beryslav, the rayon centre, is 20 km away. 49 m above sea level. 20 km away: Nova Kakhovka, the nearest bigger centre, the same 1,246. Snow and wind from the nearest regional centre in the DBN — Херсон, 50 km. 9.49 m between rows, pitch 13.36 m (latitude 46.9°).

Yield of 1 kWp
1,251kWh/year
Tilt
36°2° east of south
10 kW
12,508kWh/year
Row pitch
13.36m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Virivka

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 50 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan64Feb107Mar126Apr143May143Jun153Jul153Aug129Sep99Oct53Nov37Dec

July: 153 kWh/kWp, December: 37 — 4.1 times less.

February: 64 against 60 in the oblast, 6.7% more.

Virivka: plants, kWh
kWpA yearJulyDecember
56,254765185
1012,5081,530370
1518,7622,295555

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Beryslavskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.