Solar plant: site data

Solar power plant in Trudoliubivka, Beryslavskyi Raion, Kherson Oblast

Trudoliubivka: 1,221 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 2.6% below the oblast median (1,253). #78 of 151 in the rayon, #617 of 711 in the oblast.

Beryslav, the rayon centre, is 71 km away. 83 m above sea level. 48 km away: Hornostayivka, the nearest bigger centre, 1,236 — 1.3% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 117 km. 9.84 m between rows, pitch 13.71 m (latitude 47.4°).

Yield of 1 kWp
1,221kWh/year
Tilt
36°2° east of south
10 kW
12,207kWh/year
Row pitch
13.71m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Trudoliubivka

The designer opens with this place’s coordinates, latitude 47.4° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 117 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan57Feb101Mar123Apr142May145Jun155Jul153Aug127Sep95Oct50Nov32Dec

July: 155 kWh/kWp, December: 32 — 4.8 times less.

December: 32 against 37 in the oblast, 13.5% less.

Trudoliubivka: plants, kWh
kWpA yearJulyDecember
56,104775160
1012,2071,550320
1518,3112,325480

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Beryslavskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.