Solar plant: site data

Solar power plant in Svyrydonivka, Henicheskyi Raion, Kherson Oblast

Svyrydonivka: 1,255 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,253). #83 of 167 in the rayon, #332 of 711 in the oblast.

Henichesk, the rayon centre, is 50 km away. 30 m above sea level. 50 km away: Henichesk, the nearest bigger centre, the same 1,260. Snow and wind from the nearest regional centre in the DBN — Херсон, 135 km. 9.25 m between rows, pitch 13.12 m (latitude 46.5°).

Yield of 1 kWp
1,255kWh/year
Tilt
36°2° east of south
10 kW
12,553kWh/year
Row pitch
13.12m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Svyrydonivka

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 135 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan60Feb106Mar125Apr145May142Jun153Jul154Aug130Sep100Oct57Nov38Dec

August: 154 kWh/kWp, December: 38 — 4.1 times less.

November: 57 against 55 in the oblast, 3.6% more.

Svyrydonivka: plants, kWh
kWpA yearAugustDecember
56,277770190
1012,5531,540380
1518,8302,310570

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.