Solar plant: site data

Solar power plant in Pryvitne, Khersonskyi Raion, Kherson Oblast

Pryvitne: 1,275 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.8% above the oblast median (1,253). #31 of 109 in the rayon, #201 of 711 in the oblast.

Kherson, the rayon centre, is 48 km away. 15 m above sea level. 32 km away: Skadovsk, the nearest bigger centre, 1,302 — 2.1% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 48 km. 9.18 m between rows, pitch 13.05 m (latitude 46.4°).

Yield of 1 kWp
1,275kWh/year
Tilt
36°1° east of south
10 kW
12,751kWh/year
Row pitch
13.05m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Pryvitne

The designer opens with this place’s coordinates, latitude 46.4° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 48 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan62Feb110Mar130Apr145May143Jun156Jul154Aug131Sep100Oct58Nov39Dec

July: 156 kWh/kWp, December: 39 — 4.0 times less.

November: 58 against 55 in the oblast, 5.5% more.

Pryvitne: plants, kWh
kWpA yearJulyDecember
56,376780195
1012,7511,560390
1519,1272,340585

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khersonskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.