Solar plant: site data

Solar power plant in Promin, Skadovskyi Raion, Kherson Oblast

Promin: 1,294 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 3.2% above the oblast median (1,253). #85 of 114 in the rayon, #114 of 711 in the oblast.

Skadovsk, the rayon centre, is 27 km away. 31 m above sea level. 27 km away: Skadovsk, the nearest bigger centre, 1,302 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 35 km. 9.16 m between rows, pitch 13.03 m (latitude 46.3°).

Yield of 1 kWp
1,294kWh/year
Tilt
36°1° east of south
10 kW
12,936kWh/year
Row pitch
13.03m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Promin

The designer opens with this place’s coordinates, latitude 46.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 35 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan65Feb112Mar133Apr146May144Jun157Jul155Aug132Sep102Oct59Nov40Dec

July: 157 kWh/kWp, December: 40 — 3.9 times less.

January: 48 against 44 in the oblast, 9.1% more.

Promin: plants, kWh
kWpA yearJulyDecember
56,468785200
1012,9361,570400
1519,4042,355600

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Skadovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.