Solar plant: site data

Solar power plant in Plodove, Kakhovskyi Raion, Kherson Oblast

Plodove: 1,260 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 0.5% above the oblast median (1,253). #23 of 170 in the rayon, #281 of 711 in the oblast.

Nova Kakhovka, the rayon centre, is 5 km away. 17 m above sea level. 5 km away: Nova Kakhovka, the nearest bigger centre, 1,246 — 1.1% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 60 km. 9.39 m between rows, pitch 13.26 m (latitude 46.7°).

Yield of 1 kWp
1,260kWh/year
Tilt
36°1° east of south
10 kW
12,599kWh/year
Row pitch
13.26m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Plodove

The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 60 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan62Feb108Mar126Apr144May145Jun156Jul155Aug130Sep99Oct54Nov36Dec

July: 156 kWh/kWp, December: 36 — 4.3 times less.

February: 62 against 60 in the oblast, 3.3% more.

Plodove: plants, kWh
kWpA yearJulyDecember
56,300780180
1012,5991,560360
1518,8992,340540

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kakhovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.