Solar plant: site data

Solar power plant in Petrivka, Skadovskyi Raion, Kherson Oblast

Petrivka: 1,334 kWh per kWp a year, tilt 37° 2° west of south (PVGIS). 6.4% above the oblast median (1,253). #13 of 114 in the rayon, #13 of 711 in the oblast.

Skadovsk, the rayon centre, is 30 km away. 16 m above sea level. 30 km away: Skadovsk, the nearest bigger centre, 1,302 — 2.4% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 51 km. 9.30 m between rows, pitch 13.12 m (latitude 46.2°).

Yield of 1 kWp
1,334kWh/year
Tilt
37°2° west of south
10 kW
13,336kWh/year
Row pitch
13.12m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Petrivka

The designer opens with this place’s coordinates, latitude 46.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 51 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

52Jan69Feb115Mar136Apr151May150Jun161Jul158Aug135Sep104Oct61Nov43Dec

July: 161 kWh/kWp, December: 43 — 3.7 times less.

January: 52 against 44 in the oblast, 18.2% more.

Petrivka: plants, kWh
kWpA yearJulyDecember
56,668805215
1013,3361,610430
1520,0042,415645

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Skadovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.