Solar plant: site data

Solar power plant in Pershokostiantynivka, Kakhovskyi Raion, Kherson Oblast

Pershokostiantynivka: 1,308 kWh per kWp a year, tilt 37° facing south (PVGIS). 4.4% above the oblast median (1,253). #3 of 170 in the rayon, #48 of 711 in the oblast.

Nova Kakhovka, the rayon centre, is 62 km away. 10 m above sea level. 16 km away: Armyansk, the nearest bigger centre, 1,317 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 92 km. 9.33 m between rows, pitch 13.15 m (latitude 46.2°).

Yield of 1 kWp
1,308kWh/year
Tilt
37°facing south
10 kW
13,080kWh/year
Row pitch
13.15m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Pershokostiantynivka

The designer opens with this place’s coordinates, latitude 46.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 92 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

54Jan66Feb111Mar131Apr150May146Jun157Jul157Aug133Sep103Oct59Nov42Dec

July: 157 kWh/kWp, December: 42 — 3.7 times less.

January: 54 against 44 in the oblast, 22.7% more.

Pershokostiantynivka: plants, kWh
kWpA yearJulyDecember
56,540785210
1013,0801,570420
1519,6202,355630

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kakhovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.