Solar power plant in Novyi Trud, Henicheskyi Raion, Kherson Oblast

Novyi Trud: 1,315 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 5.0% above the oblast median (1,253). #1 of 167 in the rayon, #33 of 711 in the oblast.

Henichesk, the rayon centre, is 22 km away. 12 m above sea level. 22 km away: Henichesk, the nearest bigger centre, 1,260 — 4.4% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 162 km. 9.02 m between rows, pitch 12.89 m (latitude 46.1°).

Yield of 1 kWp
1,315kWh/year
Tilt
36°1° west of south
10 kW
13,154kWh/year
Row pitch
12.89m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novyi Trud

The designer opens with this place’s coordinates, latitude 46.1° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 162 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan61Feb111Mar133Apr154May150Jun162Jul162Aug137Sep101Oct57Nov42Dec

July: 162 kWh/kWp, December: 42 — 3.9 times less.

December: 42 against 37 in the oblast, 13.5% more.

Novyi Trud: plants, kWh
kWpA yearJulyDecember
56,577810210
1013,1541,620420
1519,7312,430630

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks