Solar plant: site data

Solar power plant in Novomykolaivka, Beryslavskyi Raion, Kherson Oblast

Novomykolaivka: 1,216 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.0% below the oblast median (1,253). #94 of 151 in the rayon, #648 of 711 in the oblast.

Beryslav, the rayon centre, is 56 km away. 79 m above sea level. 41 km away: Hornostayivka, the nearest bigger centre, 1,236 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 102 km. 9.77 m between rows, pitch 13.64 m (latitude 47.3°).

Yield of 1 kWp
1,216kWh/year
Tilt
36°3° east of south
10 kW
12,157kWh/year
Row pitch
13.64m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novomykolaivka

The designer opens with this place’s coordinates, latitude 47.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 102 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan55Feb100Mar123Apr141May143Jun154Jul152Aug127Sep97Oct51Nov33Dec

July: 154 kWh/kWp, December: 33 — 4.7 times less.

January: 39 against 44 in the oblast, 11.4% less.

Novomykolaivka: plants, kWh
kWpA yearJulyDecember
56,079770165
1012,1571,540330
1518,2362,310495

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Beryslavskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.