Solar plant: site data

Solar power plant in Myroliubivka, Khersonskyi Raion, Kherson Oblast

Myroliubivka: 1,279 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.0% above the oblast median (1,253). #23 of 109 in the rayon, #183 of 711 in the oblast.

Kherson, the rayon centre, is 26 km away. 39 m above sea level. 16 km away: Bilozerka, the nearest bigger centre, 1,286 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 26 km. 9.62 m between rows, pitch 13.44 m (latitude 46.7°).

Yield of 1 kWp
1,279kWh/year
Tilt
37°1° east of south
10 kW
12,786kWh/year
Row pitch
13.44m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Myroliubivka

The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 26 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

47Jan65Feb110Mar131Apr145May144Jun154Jul154Aug131Sep102Oct56Nov40Dec

July: 154 kWh/kWp, December: 40 — 3.9 times less.

February: 65 against 60 in the oblast, 8.3% more.

Myroliubivka: plants, kWh
kWpA yearJulyDecember
56,393770200
1012,7861,540400
1519,1792,310600

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khersonskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.