Solar plant: site data

Solar power plant in Mykhailiv, Beryslavskyi Raion, Kherson Oblast

Mykhailiv: 1,202 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 4.1% below the oblast median (1,253). #141 of 151 in the rayon, #701 of 711 in the oblast.

Beryslav, the rayon centre, is 69 km away. 81 m above sea level. 19 km away: Bereznehuvate, the nearest bigger centre, 1,216 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 91 km. 9.81 m between rows, pitch 13.68 m (latitude 47.4°).

Yield of 1 kWp
1,202kWh/year
Tilt
36°3° east of south
10 kW
12,019kWh/year
Row pitch
13.68m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Mykhailiv

The designer opens with this place’s coordinates, latitude 47.4° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 91 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan56Feb99Mar123Apr139May142Jun153Jul152Aug126Sep96Oct49Nov33Dec

July: 153 kWh/kWp, December: 33 — 4.6 times less.

January: 36 against 44 in the oblast, 18.2% less.

Mykhailiv: plants, kWh
kWpA yearJulyDecember
56,010765165
1012,0191,530330
1518,0292,295495

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Beryslavskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.