Solar plant: site data

Solar power plant in Marine, Beryslavskyi Raion, Kherson Oblast

Marine: 1,210 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 3.4% below the oblast median (1,253). #114 of 151 in the rayon, #674 of 711 in the oblast.

Beryslav, the rayon centre, is 71 km away. 23 m above sea level. 41 km away: Bereznehuvate, the nearest bigger centre, the same 1,216. Snow and wind from the nearest regional centre in the DBN — Херсон, 107 km. 9.85 m between rows, pitch 13.72 m (latitude 47.5°).

Yield of 1 kWp
1,210kWh/year
Tilt
36°3° east of south
10 kW
12,104kWh/year
Row pitch
13.72m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Marine

The designer opens with this place’s coordinates, latitude 47.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 107 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan56Feb99Mar123Apr141May143Jun153Jul151Aug126Sep96Oct50Nov33Dec

July: 153 kWh/kWp, December: 33 — 4.6 times less.

January: 38 against 44 in the oblast, 13.6% less.

Marine: plants, kWh
kWpA yearJulyDecember
56,052765165
1012,1041,530330
1518,1562,295495

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Beryslavskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.