Solar plant: site data

Solar power plant in Mala Kardashynka, Skadovskyi Raion, Kherson Oblast

Mala Kardashynka: 1,285 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 2.6% above the oblast median (1,253). #101 of 114 in the rayon, #160 of 711 in the oblast.

Skadovsk, the rayon centre, is 50 km away. 5 m above sea level. 15 km away: Kherson, the nearest bigger centre, 1,276 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 15 km. 9.48 m between rows, pitch 13.30 m (latitude 46.5°).

Yield of 1 kWp
1,285kWh/year
Tilt
37°1° east of south
10 kW
12,852kWh/year
Row pitch
13.30m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Mala Kardashynka

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 15 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

50Jan68Feb111Mar130Apr142May143Jun155Jul154Aug132Sep101Oct57Nov41Dec

July: 155 kWh/kWp, December: 41 — 3.8 times less.

January: 50 against 44 in the oblast, 13.6% more.

Mala Kardashynka: plants, kWh
kWpA yearJulyDecember
56,426775205
1012,8521,550410
1519,2782,325615

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Skadovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.