Solar plant: site data
Solar power plant in Kostromka, Beryslavskyi Raion, Kherson Oblast
Kostromka: 1,225 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 2.3% below the oblast median (1,253). #65 of 151 in the rayon, #590 of 711 in the oblast.
Beryslav, the rayon centre, is 39 km away. 68 m above sea level. 26 km away: Snihurivka, the nearest bigger centre, 1,232 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 68 km. 9.64 m between rows, pitch 13.51 m (latitude 47.1°).
- Yield of 1 kWp
- 1,225kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 12,248kWh/year
- Row pitch
- 13.51m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Kostromka
The designer opens with this place’s coordinates, latitude 47.1° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 68 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 153 kWh/kWp, December: 35 — 4.4 times less.
January: 40 against 44 in the oblast, 9.1% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,124 | 765 | 175 |
| 10 | 12,248 | 1,530 | 350 |
| 15 | 18,372 | 2,295 | 525 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Shchaslyve3 km1,225 kWh/kWp
- Sukhyi Stavok4 km1,222 kWh/kWp
- Bruskynske5 km1,220 kWh/kWp
- Bilohirka7 km1,218 kWh/kWp
- Ishchenka9 km1,220 kWh/kWp
- Stepove9 km1,228 kWh/kWp
All places: Beryslavskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.