Solar plant: site data

Solar power plant in Havrylivka Druha, Skadovskyi Raion, Kherson Oblast

Havrylivka Druha: 1,311 kWh per kWp a year, tilt 36° facing south (PVGIS). 4.6% above the oblast median (1,253). #39 of 114 in the rayon, #41 of 711 in the oblast.

Skadovsk, the rayon centre, is 44 km away. 9 m above sea level. 19 km away: Armyansk, the nearest bigger centre, the same 1,317. Snow and wind from the nearest regional centre in the DBN — Херсон, 83 km. 9.07 m between rows, pitch 12.94 m (latitude 46.2°).

Yield of 1 kWp
1,311kWh/year
Tilt
36°facing south
10 kW
13,108kWh/year
Row pitch
12.94m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Havrylivka Druha

The designer opens with this place’s coordinates, latitude 46.2° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 83 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

51Jan64Feb110Mar132Apr152May148Jun159Jul157Aug134Sep102Oct59Nov42Dec

July: 159 kWh/kWp, December: 42 — 3.8 times less.

January: 51 against 44 in the oblast, 15.9% more.

Havrylivka Druha: plants, kWh
kWpA yearJulyDecember
56,554795210
1013,1081,590420
1519,6622,385630

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Skadovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.