Solar plant: site data

Solar power plant in Chumatske, Kakhovskyi Raion, Kherson Oblast

Chumatske: 1,259 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,253). #31 of 170 in the rayon, #292 of 711 in the oblast.

Nova Kakhovka, the rayon centre, is 51 km away. 26 m above sea level. 45 km away: Armyansk, the nearest bigger centre, 1,317 — 4.4% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 99 km. 9.25 m between rows, pitch 13.12 m (latitude 46.5°).

Yield of 1 kWp
1,259kWh/year
Tilt
36°2° east of south
10 kW
12,588kWh/year
Row pitch
13.12m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Chumatske

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 99 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

48Jan61Feb108Mar126Apr144May142Jun153Jul153Aug129Sep100Oct56Nov39Dec

July: 153 kWh/kWp, December: 39 — 3.9 times less.

January: 48 against 44 in the oblast, 9.1% more.

Chumatske: plants, kWh
kWpA yearJulyDecember
56,294765195
1012,5881,530390
1518,8822,295585

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kakhovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.