Solar plant: site data

Solar power plant in Chorna Dolyna, Kakhovskyi Raion, Kherson Oblast

Chorna Dolyna: 1,254 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,253). #59 of 170 in the rayon, #344 of 711 in the oblast.

Nova Kakhovka, the rayon centre, is 27 km away. 37 m above sea level. 27 km away: Nova Kakhovka, the nearest bigger centre, 1,246 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 66 km. 9.27 m between rows, pitch 13.14 m (latitude 46.5°).

Yield of 1 kWp
1,254kWh/year
Tilt
36°2° east of south
10 kW
12,541kWh/year
Row pitch
13.14m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Chorna Dolyna

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 66 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan61Feb108Mar126Apr144May142Jun153Jul153Aug130Sep100Oct55Nov38Dec

July: 153 kWh/kWp, December: 38 — 4.0 times less.

December: 38 against 37 in the oblast, 2.7% more.

Chorna Dolyna: plants, kWh
kWpA yearJulyDecember
56,271765190
1012,5411,530380
1518,8122,295570

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kakhovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.