Solar plant: site data

Solar power plant in Chervonyi Yar, Kakhovskyi Raion, Kherson Oblast

Chervonyi Yar: 1,292 kWh per kWp a year, tilt 36° facing south (PVGIS). 3.1% above the oblast median (1,253). #5 of 170 in the rayon, #129 of 711 in the oblast.

Nova Kakhovka, the rayon centre, is 52 km away. 15 m above sea level. 27 km away: Armyansk, the nearest bigger centre, 1,317 — 1.9% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 76 km. 9.14 m between rows, pitch 13.01 m (latitude 46.3°).

Yield of 1 kWp
1,292kWh/year
Tilt
36°facing south
10 kW
12,919kWh/year
Row pitch
13.01m · GCR 0.37
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Chervonyi Yar

The designer opens with this place’s coordinates, latitude 46.3° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 76 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

50Jan63Feb110Mar130Apr149May145Jun156Jul155Aug132Sep102Oct59Nov41Dec

July: 156 kWh/kWp, December: 41 — 3.8 times less.

January: 50 against 44 in the oblast, 13.6% more.

Chervonyi Yar: plants, kWh
kWpA yearJulyDecember
56,460780205
1012,9191,560410
1519,3792,340615

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kakhovskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.