Solar plant: site data

Solar power plant in Chernihivka, Henicheskyi Raion, Kherson Oblast

Chernihivka: 1,276 kWh per kWp a year, tilt 35° 1° west of south (PVGIS). 1.8% above the oblast median (1,253). #53 of 167 in the rayon, #197 of 711 in the oblast.

Henichesk, the rayon centre, is 16 km away. 7 m above sea level. 16 km away: Henichesk, the nearest bigger centre, 1,260 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Херсон, 163 km. 8.83 m between rows, pitch 12.75 m (latitude 46.1°).

Yield of 1 kWp
1,276kWh/year
Tilt
35°1° west of south
10 kW
12,757kWh/year
Row pitch
12.75m · GCR 0.38
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Chernihivka

The designer opens with this place’s coordinates, latitude 46.1° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 163 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan59Feb105Mar129Apr150May147Jun158Jul158Aug133Sep97Oct54Nov41Dec

July: 158 kWh/kWp, December: 41 — 3.9 times less.

December: 41 against 37 in the oblast, 10.8% more.

Chernihivka: plants, kWh
kWpA yearJulyDecember
56,379790205
1012,7571,580410
1519,1362,370615

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Henicheskyi RaionKherson Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.