Solar plant: site data
Solar power plant in Bratske, Henicheskyi Raion, Kherson Oblast
Bratske: 1,237 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.3% below the oblast median (1,253). #132 of 167 in the rayon, #488 of 711 in the oblast.
Henichesk, the rayon centre, is 86 km away. 47 m above sea level. 40 km away: Hornostayivka, the nearest bigger centre, the same 1,236. Snow and wind from the nearest regional centre in the DBN — Херсон, 117 km. 9.43 m between rows, pitch 13.30 m (latitude 46.8°).
- Yield of 1 kWp
- 1,237kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 12,373kWh/year
- Row pitch
- 13.30m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Bratske
The designer opens with this place’s coordinates, latitude 46.8° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 117 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 152 kWh/kWp, December: 37 — 4.1 times less.
February: 58 against 60 in the oblast, 3.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,187 | 760 | 185 |
| 10 | 12,373 | 1,520 | 370 |
| 15 | 18,560 | 2,280 | 555 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
- Zapovitne4 km1,235 kWh/kWp
- Stepne4 km1,237 kWh/kWp
- Nova Blahovishchenka7 km1,234 kWh/kWp
- Vasylivka7 km1,235 kWh/kWp
- Nyzhni Torhai9 km1,233 kWh/kWp
- Novorepivka10 km1,242 kWh/kWp
All places: Henicheskyi RaionKherson Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.