Solar plant: site data

Solar power plant in Vasyliv Khutir, Chuhuivskyi Raion, Kharkiv Oblast

Vasyliv Khutir: 1,142 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,142). #65 of 229 in the rayon, #874 of 1769 in the oblast.

Chuhuyiv, the rayon centre, is 6 km away. 99 m above sea level. 6 km away: Chuhuyiv, the nearest bigger centre, the same 1,144. Snow and wind from the nearest regional centre in the DBN — Харків, 32 km. 12.21 m between rows, pitch 15.98 m (latitude 49.8°).

Yield of 1 kWp
1,142kWh/year
Tilt
38°2° east of south
10 kW
11,422kWh/year
Row pitch
15.98m · GCR 0.30
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Vasyliv Khutir

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Харків, 32 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan60Feb96Mar115Apr135May140Jun145Jul144Aug117Sep82Oct41Nov27Dec

July: 145 kWh/kWp, December: 27 — 5.4 times less.

December: 27 against 24 in the oblast, 12.5% more.

Vasyliv Khutir: plants, kWh
kWpA yearJulyDecember
55,711725135
1011,4221,450270
1517,1332,175405

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Chuhuivskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.