Solar plant: site data
Solar power plant in Udy, Bohodukhivskyi Raion, Kharkiv Oblast
Udy: 1,121 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.9% below the oblast median (1,142). #318 of 354 in the rayon, #1688 of 1769 in the oblast.
Bohodukhiv, the rayon centre, is 46 km away. 144 m above sea level. 46 km away: Bohodukhiv, the nearest bigger centre, 1,127 — 0.5% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 46 km. 12.46 m between rows, pitch 16.28 m (latitude 50.4°).
- Yield of 1 kWp
- 1,121kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,208kWh/year
- Row pitch
- 16.28m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,600 / 430Pa
Ground frame designer
A ground frame for a solar plant: Udy
The designer opens with this place’s coordinates, latitude 50.4° for the row spacing and the DBN loads of the nearest regional centre — Харків, 46 km: snow 1,600 Pa, wind 430 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 146 kWh/kWp, December: 23 — 6.3 times less.
November: 36 against 40 in the oblast, 10.0% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,604 | 730 | 115 |
| 10 | 11,208 | 1,460 | 230 |
| 15 | 16,812 | 2,190 | 345 |
Example: a 10 kW ground frame
For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.
How these numbers are computed
Nearby
- Konstiantynivka3 km1,114 kWh/kWp
- Sosnivka5 km1,119 kWh/kWp
- Butov5 km1,120 kWh/kWp
- Chervona Zoria6 km1,121 kWh/kWp
- Baranivka6 km1,118 kWh/kWp
- Andriivka6 km1,115 kWh/kWp
All places: Bohodukhivskyi RaionKharkiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.