Solar power plant in Sytnyky, Bohodukhivskyi Raion, Kharkiv Oblast
Sytnyky: 1,140 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,142). #81 of 354 in the rayon, #995 of 1769 in the oblast.
Bohodukhiv, the rayon centre, is 31 km away. 161 m above sea level. 26 km away: Kotelva, the nearest bigger centre, the same 1,138. Snow and wind from the nearest regional centre in the DBN — Полтава, 69 km. 12.46 m between rows, pitch 16.23 m (latitude 50.1°).
- Yield of 1 kWp
- 1,140kWh/year
- Tilt
- 38°2° east of south
- 10 kW
- 11,402kWh/year
- Row pitch
- 16.23m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,450 / 470Pa
Ground frame designer
A ground frame for a solar plant: Sytnyky
The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 69 km: snow 1,450 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 146 kWh/kWp, December: 24 — 6.1 times less.
February: 60 against 57 in the oblast, 5.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,701 | 730 | 120 |
| 10 | 11,402 | 1,460 | 240 |
| 15 | 17,103 | 2,190 | 360 |
Example: a 10 kW ground frame
For the loads of Poltava: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.
How these numbers are computed
Nearby
- Stepanivka2 km1,140 kWh/kWp
- Osnovyntsi5 km1,132 kWh/kWp
- Krasnokutsk6 km1,131 kWh/kWp
- Harkavets6 km1,136 kWh/kWp
- Luchky6 km1,138 kWh/kWp
- Cherneshchyna7 km1,126 kWh/kWp
All places: Bohodukhivskyi RaionKharkiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.