Solar power plant in Cherneshchyna, Bohodukhivskyi Raion, Kharkiv Oblast

Cherneshchyna: 1,126 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.4% below the oblast median (1,142). #279 of 354 in the rayon, #1591 of 1769 in the oblast.

Bohodukhiv, the rayon centre, is 25 km away. 119 m above sea level. 25 km away: Bohodukhiv, the nearest bigger centre, the same 1,127. Snow and wind from the nearest regional centre in the DBN — Полтава, 72 km. 12.17 m between rows, pitch 15.99 m (latitude 50.1°).

Yield of 1 kWp
1,126kWh/year
Tilt
37°2° east of south
10 kW
11,258kWh/year
Row pitch
15.99m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,450 / 470Pa

Ground frame designer

A ground frame for a solar plant: Cherneshchyna

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 72 km: snow 1,450 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan57Feb94Mar115Apr137May141Jun144Jul143Aug115Sep80Oct38Nov23Dec

July: 144 kWh/kWp, December: 23 — 6.3 times less.

November: 38 against 40 in the oblast, 5.0% less.

Cherneshchyna: plants, kWh
kWpA yearJulyDecember
55,629720115
1011,2581,440230
1516,8872,160345

Snow and wind: Полтава

Example: a 10 kW ground frame

For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bohodukhivskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.