Solar plant: site data
Solar power plant in Sheludkove, Bohodukhivskyi Raion, Kharkiv Oblast
Sheludkove: 1,129 kWh per kWp a year, tilt 36° facing south (PVGIS). 1.1% below the oblast median (1,142). #256 of 354 in the rayon, #1503 of 1769 in the oblast.
Bohodukhiv, the rayon centre, is 47 km away. 128 m above sea level. 14 km away: Chutove, the nearest bigger centre, 1,139 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Полтава, 60 km. 11.59 m between rows, pitch 15.46 m (latitude 49.8°).
- Yield of 1 kWp
- 1,129kWh/year
- Tilt
- 36°facing south
- 10 kW
- 11,293kWh/year
- Row pitch
- 15.46m · GCR 0.31
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,450 / 470Pa
Ground frame designer
A ground frame for a solar plant: Sheludkove
The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 60 km: snow 1,450 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 22 — 6.7 times less.
January: 35 against 39 in the oblast, 10.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,647 | 740 | 110 |
| 10 | 11,293 | 1,480 | 220 |
| 15 | 16,940 | 2,220 | 330 |
Example: a 10 kW ground frame
For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Hannivka3 km1,138 kWh/kWp
- Bondarivka3 km1,135 kWh/kWp
- Mozolivka3 km1,138 kWh/kWp
- Andrusivka3 km1,133 kWh/kWp
- Stepove4 km1,138 kWh/kWp
- Redkodub4 km1,135 kWh/kWp
All places: Bohodukhivskyi RaionKharkiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.