Rakivka: 1,149 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.6% above the oblast median (1,142). #116 of 208 in the rayon, #452 of 1769 in the oblast.

Berestyn, the rayon centre, is 25 km away. 144 m above sea level. 25 km away: Berestyn, the nearest bigger centre, 1,158 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 64 km. 11.69 m between rows, pitch 15.51 m (latitude 49.6°).

Yield of 1 kWp
1,149kWh/year
Tilt
37°1° east of south
10 kW
11,486kWh/year
Row pitch
15.51m · GCR 0.31
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Rakivka

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Харків, 64 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan57Feb94Mar115Apr137May143Jun148Jul147Aug118Sep85Oct41Nov24Dec

July: 148 kWh/kWp, December: 24 — 6.2 times less.

November: 41 against 40 in the oblast, 2.5% more.

Rakivka: plants, kWh
kWpA yearJulyDecember
55,743740120
1011,4861,480240
1517,2292,220360

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berestynskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.