Solar power plant in Pryliutove, Kupianskyi Raion, Kharkiv Oblast

Pryliutove: 1,132 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 0.9% below the oblast median (1,142). #158 of 285 in the rayon, #1407 of 1769 in the oblast.

Kupyansk, the rayon centre, is 26 km away. 161 m above sea level. 26 km away: Kupyansk, the nearest bigger centre, 1,150 — 1.6% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 87 km. 12.00 m between rows, pitch 15.82 m (latitude 49.9°).

Yield of 1 kWp
1,132kWh/year
Tilt
37°3° east of south
10 kW
11,318kWh/year
Row pitch
15.82m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Pryliutove

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Харків, 87 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan56Feb91Mar115Apr137May143Jun147Jul145Aug116Sep81Oct38Nov23Dec

July: 147 kWh/kWp, December: 23 — 6.4 times less.

November: 38 against 40 in the oblast, 5.0% less.

Pryliutove: plants, kWh
kWpA yearJulyDecember
55,659735115
1011,3181,470230
1516,9772,205345

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kupianskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.