Solar plant: site data

Solar power plant in Odradove, Lozivskyi Raion, Kharkiv Oblast

Odradove: 1,150 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.7% above the oblast median (1,142). #174 of 256 in the rayon, #370 of 1769 in the oblast.

Lozova, the rayon centre, is 47 km away. 107 m above sea level. 47 km away: Lozova, the nearest bigger centre, the same 1,153. Snow and wind from the nearest regional centre in the DBN — Харків, 78 km. 11.46 m between rows, pitch 15.28 m (latitude 49.3°).

Yield of 1 kWp
1,150kWh/year
Tilt
37°1° east of south
10 kW
11,500kWh/year
Row pitch
15.28m · GCR 0.31
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Odradove

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Харків, 78 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan51Feb93Mar116Apr138May144Jun150Jul148Aug120Sep86Oct42Nov24Dec

July: 150 kWh/kWp, December: 24 — 6.3 times less.

February: 51 against 57 in the oblast, 10.5% less.

Odradove: plants, kWh
kWpA yearJulyDecember
55,750750120
1011,5001,500240
1517,2502,250360

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks