Solar plant: site data

Solar power plant in Novoselivka, Bohodukhivskyi Raion, Kharkiv Oblast

Novoselivka: 1,120 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.9% below the oblast median (1,142). #323 of 354 in the rayon, #1694 of 1769 in the oblast.

Bohodukhiv, the rayon centre, is 13 km away. 174 m above sea level. 13 km away: Bohodukhiv, the nearest bigger centre, 1,127 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 41 km. 12.19 m between rows, pitch 16.01 m (latitude 50.1°).

Yield of 1 kWp
1,120kWh/year
Tilt
37°1° east of south
10 kW
11,202kWh/year
Row pitch
16.01m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Novoselivka

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Харків, 41 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan54Feb87Mar115Apr137May143Jun146Jul144Aug114Sep80Oct38Nov23Dec

July: 146 kWh/kWp, December: 23 — 6.3 times less.

March: 87 against 93 in the oblast, 6.5% less.

Novoselivka: plants, kWh
kWpA yearJulyDecember
55,601730115
1011,2021,460230
1516,8032,190345

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bohodukhivskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.