Solar plant: site data
Solar power plant in Nova Cherneshchyna, Berestynskyi Raion, Kharkiv Oblast
Nova Cherneshchyna: 1,152 kWh per kWp a year, tilt 36° facing south (PVGIS). 0.8% above the oblast median (1,142). #65 of 208 in the rayon, #294 of 1769 in the oblast.
Berestyn, the rayon centre, is 37 km away. 95 m above sea level. 37 km away: Berestyn, the nearest bigger centre, 1,158 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 79 km. 11.00 m between rows, pitch 14.87 m (latitude 49.1°).
- Yield of 1 kWp
- 1,152kWh/year
- Tilt
- 36°facing south
- 10 kW
- 11,515kWh/year
- Row pitch
- 14.87m · GCR 0.32
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,340 / 470Pa
Ground frame designer
A ground frame for a solar plant: Nova Cherneshchyna
The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 79 km: snow 1,340 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 151 kWh/kWp, December: 26 — 5.8 times less.
January: 35 against 39 in the oblast, 10.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,758 | 755 | 130 |
| 10 | 11,515 | 1,510 | 260 |
| 15 | 17,273 | 2,265 | 390 |
Example: a 10 kW ground frame
For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Kalynivka4 km1,157 kWh/kWp
- Kostyantynivka5 km1,148 kWh/kWp
- Shevchenkove6 km1,146 kWh/kWp
- Skyrtiane6 km1,155 kWh/kWp
- Sudykha7 km1,151 kWh/kWp
- Olianivka7 km1,157 kWh/kWp
All places: Berestynskyi RaionKharkiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.