Solar plant: site data

Solar power plant in Nova Cherneshchyna, Berestynskyi Raion, Kharkiv Oblast

Nova Cherneshchyna: 1,152 kWh per kWp a year, tilt 36° facing south (PVGIS). 0.8% above the oblast median (1,142). #65 of 208 in the rayon, #294 of 1769 in the oblast.

Berestyn, the rayon centre, is 37 km away. 95 m above sea level. 37 km away: Berestyn, the nearest bigger centre, 1,158 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Дніпро, 79 km. 11.00 m between rows, pitch 14.87 m (latitude 49.1°).

Yield of 1 kWp
1,152kWh/year
Tilt
36°facing south
10 kW
11,515kWh/year
Row pitch
14.87m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,340 / 470Pa

Ground frame designer

A ground frame for a solar plant: Nova Cherneshchyna

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Дніпро, 79 km: snow 1,340 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb91Mar115Apr139May144Jun151Jul149Aug120Sep88Oct42Nov26Dec

July: 151 kWh/kWp, December: 26 — 5.8 times less.

January: 35 against 39 in the oblast, 10.3% less.

Nova Cherneshchyna: plants, kWh
kWpA yearJulyDecember
55,758755130
1011,5151,510260
1517,2732,265390

Snow and wind: Дніпро

Example: a 10 kW ground frame

For the loads of Dnipro: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berestynskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.