Solar plant: site data

Solar power plant in Krasnoiarka, Berestynskyi Raion, Kharkiv Oblast

Krasnoiarka: 1,150 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.6% above the oblast median (1,142). #102 of 208 in the rayon, #400 of 1769 in the oblast.

Berestyn, the rayon centre, is 49 km away. 134 m above sea level. 37 km away: Lozova, the nearest bigger centre, the same 1,153. Snow and wind from the nearest regional centre in the DBN — Харків, 92 km. 11.09 m between rows, pitch 14.96 m (latitude 49.2°).

Yield of 1 kWp
1,150kWh/year
Tilt
36°2° east of south
10 kW
11,495kWh/year
Row pitch
14.96m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Krasnoiarka

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Харків, 92 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan53Feb92Mar115Apr138May144Jun150Jul148Aug120Sep87Oct42Nov25Dec

July: 150 kWh/kWp, December: 25 — 6.0 times less.

February: 53 against 57 in the oblast, 7.0% less.

Krasnoiarka: plants, kWh
kWpA yearJulyDecember
55,748750125
1011,4951,500250
1517,2432,250375

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berestynskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.