Solar plant: site data

Solar power plant in Kochetok, Chuhuivskyi Raion, Kharkiv Oblast

Kochetok: 1,143 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). Exactly the oblast median (1,142). #58 of 229 in the rayon, #836 of 1769 in the oblast.

Chuhuyiv, the rayon centre, is 6 km away. 151 m above sea level. 6 km away: Chuhuyiv, the nearest bigger centre, the same 1,144. Snow and wind from the nearest regional centre in the DBN — Харків, 38 km. 12.25 m between rows, pitch 16.02 m (latitude 49.9°).

Yield of 1 kWp
1,143kWh/year
Tilt
38°1° east of south
10 kW
11,429kWh/year
Row pitch
16.02m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Kochetok

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Харків, 38 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan61Feb96Mar115Apr136May142Jun146Jul144Aug117Sep81Oct40Nov26Dec

July: 146 kWh/kWp, December: 26 — 5.6 times less.

December: 26 against 24 in the oblast, 8.3% more.

Kochetok: plants, kWh
kWpA yearJulyDecember
55,715730130
1011,4291,460260
1517,1442,190390

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed