Solar plant: site data

Solar power plant in Karlivka, Bohodukhivskyi Raion, Kharkiv Oblast

Karlivka: 1,135 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.6% below the oblast median (1,142). #181 of 354 in the rayon, #1290 of 1769 in the oblast.

Bohodukhiv, the rayon centre, is 11 km away. 195 m above sea level. 11 km away: Bohodukhiv, the nearest bigger centre, 1,127 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Харків, 58 km. 12.16 m between rows, pitch 15.98 m (latitude 50.1°).

Yield of 1 kWp
1,135kWh/year
Tilt
37°1° east of south
10 kW
11,348kWh/year
Row pitch
15.98m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Karlivka

The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Харків, 58 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan59Feb93Mar115Apr138May142Jun146Jul145Aug115Sep81Oct39Nov24Dec

July: 146 kWh/kWp, December: 24 — 6.1 times less.

February: 59 against 57 in the oblast, 3.5% more.

Karlivka: plants, kWh
kWpA yearJulyDecember
55,674730120
1011,3481,460240
1517,0222,190360

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Bohodukhivskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.