Solar plant: site data

Solar power plant in Chervonyi Step, Berestynskyi Raion, Kharkiv Oblast

Chervonyi Step: 1,149 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 0.6% above the oblast median (1,142). #111 of 208 in the rayon, #431 of 1769 in the oblast.

Berestyn, the rayon centre, is 55 km away. 172 m above sea level. 33 km away: Lozova, the nearest bigger centre, the same 1,153. Snow and wind from the nearest regional centre in the DBN — Харків, 92 km. 11.08 m between rows, pitch 14.95 m (latitude 49.2°).

Yield of 1 kWp
1,149kWh/year
Tilt
36°1° east of south
10 kW
11,490kWh/year
Row pitch
14.95m · GCR 0.32
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Chervonyi Step

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Харків, 92 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan52Feb92Mar115Apr138May144Jun150Jul148Aug120Sep87Oct42Nov25Dec

July: 150 kWh/kWp, December: 25 — 6.0 times less.

February: 52 against 57 in the oblast, 8.8% less.

Chervonyi Step: plants, kWh
kWpA yearJulyDecember
55,745750125
1011,4901,500250
1517,2352,250375

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berestynskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.