Solar plant: site data
Solar power plant in Chervone, Berestynskyi Raion, Kharkiv Oblast
Chervone: 1,150 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.7% above the oblast median (1,142). #90 of 208 in the rayon, #363 of 1769 in the oblast.
Berestyn, the rayon centre, is 17 km away. 135 m above sea level. 17 km away: Berestyn, the nearest bigger centre, 1,158 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 72 km. 11.65 m between rows, pitch 15.47 m (latitude 49.5°).
- Yield of 1 kWp
- 1,150kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,502kWh/year
- Row pitch
- 15.47m · GCR 0.31
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,600 / 430Pa
Ground frame designer
A ground frame for a solar plant: Chervone
The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Харків, 72 km: snow 1,600 Pa, wind 430 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 148 kWh/kWp, December: 24 — 6.2 times less.
January: 38 against 39 in the oblast, 2.6% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,751 | 740 | 120 |
| 10 | 11,502 | 1,480 | 240 |
| 15 | 17,253 | 2,220 | 360 |
Example: a 10 kW ground frame
For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.
How these numbers are computed
Nearby
- Svitle4 km1,153 kWh/kWp
- Vysoke4 km1,157 kWh/kWp
- Berestovenka4 km1,154 kWh/kWp
- Kyrylivka5 km1,150 kWh/kWp
- Hranove5 km1,150 kWh/kWp
- Khrestyshche5 km1,153 kWh/kWp
All places: Berestynskyi RaionKharkiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.