Solar plant: site data

Solar power plant in Arkushyne, Kupianskyi Raion, Kharkiv Oblast

Arkushyne: 1,123 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 1.6% below the oblast median (1,142). #261 of 285 in the rayon, #1644 of 1769 in the oblast.

Kupyansk, the rayon centre, is 43 km away. 111 m above sea level. 36 km away: Chuhuyiv, the nearest bigger centre, 1,144 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Харків, 66 km. 12.05 m between rows, pitch 15.87 m (latitude 50.0°).

Yield of 1 kWp
1,123kWh/year
Tilt
37°1° east of south
10 kW
11,234kWh/year
Row pitch
15.87m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,600 / 430Pa

Ground frame designer

A ground frame for a solar plant: Arkushyne

The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Харків, 66 km: snow 1,600 Pa, wind 430 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan52Feb88Mar114Apr137May143Jun148Jul145Aug116Sep81Oct37Nov23Dec

July: 148 kWh/kWp, December: 23 — 6.4 times less.

February: 52 against 57 in the oblast, 8.8% less.

Arkushyne: plants, kWh
kWpA yearJulyDecember
55,617740115
1011,2341,480230
1516,8512,220345

Snow and wind: Харків

Example: a 10 kW ground frame

For the loads of Kharkiv: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kupianskyi RaionKharkiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.