Solar plant: site data
Solar power plant in Zhabokruki, Ivano-Frankivskyi Raion, Ivano-Frankivsk Oblast
Zhabokruki: 1,119 kWh per kWp a year, tilt 38° facing south (PVGIS). 2.0% above the oblast median (1,097). #4 of 244 in the rayon, #113 of 700 in the oblast.
Ivano-Frankivsk, the rayon centre, is 38 km away. 252 m above sea level. 17 km away: Tlumach, the nearest bigger centre, 1,105 — 1.2% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 38 km. 11.27 m between rows, pitch 15.04 m (latitude 48.8°).
- Yield of 1 kWp
- 1,119kWh/year
- Tilt
- 38°facing south
- 10 kW
- 11,186kWh/year
- Row pitch
- 15.04m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Zhabokruki
The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 38 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 136 kWh/kWp, December: 35 — 3.9 times less.
January: 42 against 46 in the oblast, 8.7% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,593 | 680 | 175 |
| 10 | 11,186 | 1,360 | 350 |
| 15 | 16,779 | 2,040 | 525 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Khotymyr4 km1,115 kWh/kWp
- Havryliak5 km1,116 kWh/kWp
- Zhyvachiv5 km1,114 kWh/kWp
- Harasymiv5 km1,098 kWh/kWp
- Obertyn6 km1,121 kWh/kWp
- Zhukiv7 km1,120 kWh/kWp
All places: Ivano-Frankivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.