Solar plant: site data

Solar power plant in Uhornyky, Kolomyiskyi Raion, Ivano-Frankivsk Oblast

Uhornyky: 1,116 kWh per kWp a year, tilt 38° facing south (PVGIS). 1.7% above the oblast median (1,097). #120 of 154 in the rayon, #136 of 700 in the oblast.

Kolomyia, the rayon centre, is 26 km away. 279 m above sea level. 19 km away: Tlumach, the nearest bigger centre, 1,105 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 24 km. 11.25 m between rows, pitch 15.02 m (latitude 48.7°).

Yield of 1 kWp
1,116kWh/year
Tilt
38°facing south
10 kW
11,159kWh/year
Row pitch
15.02m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,410 / 500Pa

Ground frame designer

A ground frame for a solar plant: Uhornyky

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 24 km: snow 1,410 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan59Feb95Mar116Apr126May124Jun134Jul133Aug109Sep87Oct47Nov38Dec

July: 134 kWh/kWp, December: 38 — 3.5 times less.

August: 133 against 130 in the oblast, 2.3% more.

Uhornyky: plants, kWh
kWpA yearJulyDecember
55,580670190
1011,1591,340380
1516,7392,010570

Snow and wind: Івано-Франківськ

Example: a 10 kW ground frame

For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kolomyiskyi RaionIvano-Frankivsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.