Solar plant: site data
Solar power plant in Lolyn, Kaluskyi Raion, Ivano-Frankivsk Oblast
Lolyn: 1,055 kWh per kWp a year, tilt 39° 8° east of south (PVGIS). 3.8% below the oblast median (1,097). #128 of 162 in the rayon, #616 of 700 in the oblast.
Kalush, the rayon centre, is 36 km away. 544 m above sea level — above 500 m the DBN snow and wind are higher. 36 km away: Kalush, the nearest bigger centre, 1,086 — 2.9% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 56 km. 11.62 m between rows, pitch 15.34 m (latitude 48.9°).
- Yield of 1 kWp
- 1,055kWh/year
- Tilt
- 39°8° east of south
- 10 kW
- 10,549kWh/year
- Row pitch
- 15.34m · GCR 0.31
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Lolyn
The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 56 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 120 kWh/kWp, December: 41 — 2.9 times less.
November: 54 against 48 in the oblast, 12.5% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,275 | 600 | 205 |
| 10 | 10,549 | 1,200 | 410 |
| 15 | 15,824 | 1,800 | 615 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Maksymivka1 km1,062 kWh/kWp
- Anhelivka1 km1,055 kWh/kWp
- Pidlisky3 km1,027 kWh/kWp
- Shevchenkove3 km1,061 kWh/kWp
- Ilemnia4 km1,051 kWh/kWp
- Novoshyn4 km1,066 kWh/kWp
All places: Kaluskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.