Solar plant: site data
Solar power plant in Lisna Slobidka, Kolomyiskyi Raion, Ivano-Frankivsk Oblast
Lisna Slobidka: 1,120 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 2.1% above the oblast median (1,097). #92 of 154 in the rayon, #101 of 700 in the oblast.
Kolomyia, the rayon centre, is 11 km away. 351 m above sea level. 11 km away: Kolomyia, the nearest bigger centre, the same 1,120. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 39 km. 11.16 m between rows, pitch 14.93 m (latitude 48.6°).
- Yield of 1 kWp
- 1,120kWh/year
- Tilt
- 38°1° east of south
- 10 kW
- 11,203kWh/year
- Row pitch
- 14.93m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Lisna Slobidka
The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 39 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 134 kWh/kWp, December: 39 — 3.4 times less.
December: 39 against 38 in the oblast, 2.6% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,602 | 670 | 195 |
| 10 | 11,203 | 1,340 | 390 |
| 15 | 16,805 | 2,010 | 585 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Rakivchyk3 km1,120 kWh/kWp
- Mala Kamianka4 km1,123 kWh/kWp
- Sheparivtsi6 km1,120 kWh/kWp
- Korshiv6 km1,122 kWh/kWp
- Lisky6 km1,121 kWh/kWp
- Tovmachyk7 km1,109 kWh/kWp
All places: Kolomyiskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.