Solar plant: site data
Solar power plant in Kryplyn, Ivano-Frankivskyi Raion, Ivano-Frankivsk Oblast
Kryplyn: 1,099 kWh per kWp a year, tilt 38° facing south (PVGIS). Exactly the oblast median (1,097). #130 of 244 in the rayon, #321 of 700 in the oblast.
Ivano-Frankivsk, the rayon centre, is 5 km away. 260 m above sea level. 5 km away: Ivano-Frankivsk, the nearest bigger centre, the same 1,095. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 5 km. 11.37 m between rows, pitch 15.14 m (latitude 48.9°).
- Yield of 1 kWp
- 1,099kWh/year
- Tilt
- 38°facing south
- 10 kW
- 10,985kWh/year
- Row pitch
- 15.14m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Kryplyn
The designer opens with this place’s coordinates, latitude 48.9° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 5 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 132 kWh/kWp, December: 38 — 3.5 times less.
November: 45 against 48 in the oblast, 6.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,493 | 660 | 190 |
| 10 | 10,985 | 1,320 | 380 |
| 15 | 16,478 | 1,980 | 570 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Mykytyntsi3 km1,101 kWh/kWp
- Cherniiv3 km1,098 kWh/kWp
- Chukalivka4 km1,104 kWh/kWp
- Uhornyky4 km1,101 kWh/kWp
- Ivano-Frankivsk5 km1,095 kWh/kWp
- Krykhivtsi6 km1,104 kWh/kWp
All places: Ivano-Frankivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.