Solar plant: site data
Solar power plant in Huta, Ivano-Frankivskyi Raion, Ivano-Frankivsk Oblast
Huta: 964 kWh per kWp a year, tilt 35° 13° west of south (PVGIS). 12.2% below the oblast median (1,097). #244 of 244 in the rayon, #693 of 700 in the oblast.
Ivano-Frankivsk, the rayon centre, is 47 km away. 617 m above sea level — above 500 m the DBN snow and wind are higher. 26 km away: Nadvirna, the nearest bigger centre, 1,085 — 11.2% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 47 km. 10.42 m between rows, pitch 14.34 m (latitude 48.7°).
- Yield of 1 kWp
- 964kWh/year
- Tilt
- 35°13° west of south
- 10 kW
- 9,636kWh/year
- Row pitch
- 14.34m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Huta
The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 47 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 118 kWh/kWp, December: 30 — 3.9 times less.
December: 30 against 38 in the oblast, 21.1% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 4,818 | 590 | 150 |
| 10 | 9,636 | 1,180 | 300 |
| 15 | 14,454 | 1,770 | 450 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Stara Huta3 km1,004 kWh/kWp
- Porohy4 km1,053 kWh/kWp
- Turivka8 km1,027 kWh/kWp
- Yablunka8 km1,073 kWh/kWp
- Bohrivka8 km1,056 kWh/kWp
- Lazy8 km1,040 kWh/kWp
All places: Ivano-Frankivskyi RaionIvano-Frankivsk Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.