Solar plant: site data

Solar power plant in Horodenka, Kolomyiskyi Raion, Ivano-Frankivsk Oblast

Horodenka: 1,123 kWh per kWp a year, tilt 37° facing south (PVGIS). 2.4% above the oblast median (1,097). #80 of 154 in the rayon, #85 of 700 in the oblast.

Kolomyia, the rayon centre, is 38 km away. 280 m above sea level. 38 km away: Kolomyia, the nearest bigger centre, the same 1,120. Snow and wind from the nearest regional centre in the DBN — Чернівці, 53 km. 10.95 m between rows, pitch 14.77 m (latitude 48.7°).

Yield of 1 kWp
1,123kWh/year
Tilt
37°facing south
10 kW
11,230kWh/year
Row pitch
14.77m · GCR 0.32
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,320 / 500Pa

Ground frame designer

A ground frame for a solar plant: Horodenka

The designer opens with this place’s coordinates, latitude 48.7° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 53 km: snow 1,320 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan53Feb95Mar119Apr130May130Jun139Jul136Aug113Sep88Oct45Nov34Dec

July: 139 kWh/kWp, December: 34 — 4.1 times less.

December: 34 against 38 in the oblast, 10.5% less.

Horodenka: plants, kWh
kWpA yearJulyDecember
55,615695170
1011,2301,390340
1516,8452,085510

Snow and wind: Чернівці

Example: a 10 kW ground frame

For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Kolomyiskyi RaionIvano-Frankivsk Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.