Spain: solar plant site data

Solar power plant in Madrid, Spain: yield, tilt angle and row spacing

Madrid: 1,620 kWh per kWp a year at the optimal tilt of 37°, 6° east of south (PVGIS). Exactly the median of the main cities of Spain (1,615). #66 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 45.5% more here.

Madrid is in Community of Madrid. Population 3,255,944 (GeoNames). 665 m above sea level. 6.79 m between rows, pitch 10.61 m, GCR 0.45 (latitude 40.4°).

Yield of 1 kWp
1,620kWh/year
Tilt
37°6° east of south
10 kW
16,204kWh/year
Row pitch
10.61m · GCR 0.45
Rank in the country
66of 147 cities

Ground frame designer

A ground frame for a solar plant: Madrid

Latitude 40.4°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

109Jan114Feb139Mar142Apr153May154Jun167Jul165Aug146Sep127Oct102Nov103Dec

July: 167 kWh/kWp, November: 102 — 1.6 times less.

September: 146 against the median of 143 for the main cities of Spain, 2.1% more.

Madrid: plants, kWh
kWpA yearJulyNovember
58,102835510
1016,2041,6701,020
1524,3062,5051,530

Fixed tilt facing south

What a table yields at another tilt than the optimal 37° — for roofs and frames with a standard slope.

Madrid: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
37° (optimum)1,620—
15°1,528−5.7%
30°1,610−0.6%
45°1,608−0.8%
90°1,078−33.5%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.