Spain: solar plant site data

Solar power plant in Ceuta, Spain: yield, tilt angle and row spacing

Ceuta: 1,592 kWh per kWp a year at the optimal tilt of 31°, 7° west of south (PVGIS). 1.4% below the median of the main cities of Spain (1,615). #95 of 147 main cities of Spain by yield. For comparison, Kyiv: 1,114 kWh/kWp — 42.9% more here.

Population 83,179 (GeoNames). 22 m above sea level. 30 km away: Algeciras, the nearest bigger city, the same 1,591 kWh/kWp. 4.74 m between rows, pitch 8.84 m, GCR 0.54 (latitude 35.9°).

Yield of 1 kWp
1,592kWh/year
Tilt
31°7° west of south
10 kW
15,922kWh/year
Row pitch
8.84m · GCR 0.54
Rank in the country
95of 147 cities

Ground frame designer

A ground frame for a solar plant: Ceuta

Latitude 35.9°: the tilt and the row pitch follow it. Enter the snow and wind for Spain in the designer, by the national annex to the Eurocode.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

105Jan105Feb132Mar140Apr158May163Jun169Jul161Aug140Sep121Oct102Nov96Dec

July: 169 kWh/kWp, December: 96 — 1.8 times less.

February: 105 against the median of 114 for the main cities of Spain, 7.9% less.

Ceuta: plants, kWh
kWpA yearJulyDecember
57,961845480
1015,9221,690960
1523,8832,5351,440

Fixed tilt facing south

What a table yields at another tilt than the optimal 31° — for roofs and frames with a standard slope.

Ceuta: yield at a fixed tilt, kWh/kWp
TiltA yearAgainst the optimum
31° (optimum)1,592—
15°1,539−3.3%
30°1,589−0.2%
45°1,556−2.3%
90°959−39.8%

Snow and wind loads

Snow and wind loads for a site in Spain follow CTE DB SE-AE (Spain’s Código Técnico de la Edificación) and, where the Eurocodes are applied, UNE-EN 1991-1-3 and UNE-EN 1991-1-4 with the Spanish National Annex. Solispec computes loads by the Ukrainian DBN V.1.2-2 only, so this page shows no snow or wind values for Spain: enter the characteristic values from these documents in the designer’s «Own snow S0» and «Own wind W0» fields.

The frame calculation for such a site is preliminary: before installation it must be checked by an engineer who works to the country’s standards.